Renovating a house: how drawings and Building Regs fit together

When a refurbishment needs Building Regulations, why drawings keep builder quotes comparable, and the drainage surprise nobody budgets for.

2 min readUpdated Sep 2026Exp|Arc team

A full renovation is a chance to reshape a home around how you actually live. It also touches structure, drainage and services at the same time, which is exactly where budgets slip when decisions get made on site instead of on paper.

Not every renovation needs planning permission. Internal works and like-for-like refurbishment usually do not, but changing the layout, moving drainage, or altering the structure will need to meet Building Regulations even where planning is not required.

Building Regulations are separate from planning. They cover safety and performance, such as structure, fire safety, ventilation, insulation and drainage. A renovation drawing set typically includes proposed layouts, drainage and the Building Regulations drawings your contractor and inspector will work from.

The most common cause of delay is starting work without a clear set of proposed drawings, which leads to decisions being made on site and costs creeping up. A coordinated set up front avoids that.

We prepare proposed layouts, drainage and a Building Regulations package, so your contractor has everything they need to price and build accurately.

What triggers Building Regulations

Structural alterations, new or altered drainage, replacement windows, electrical work, insulation upgrades and anything affecting fire escape. You can renovate an entire house without planning permission and still need building control involved throughout.

  • Removing a load-bearing wall needs calculations and an inspection
  • Moving a bathroom or kitchen engages drainage and ventilation rules
  • New circuits and consumer units are notifiable electrical work
  • Loft insulation and window replacement have thermal standards

Why builders price differently without drawings

Three builders reading the same vague brief will each imagine a different job, so their quotes are not comparable. A proposed set fixes the scope: same walls, same drainage, same specification, so the difference between quotes becomes price rather than interpretation.

Drainage is the usual surprise

Moving a kitchen or bathroom means reaching an existing soil stack with the right fall, or building a new run. It is the most common reason a beautiful layout turns out to be expensive, and it is far cheaper to discover on a drawing than under a floor.

The certificate you will need later

Building control issues a completion certificate at the end. Keep it. Conveyancing solicitors ask for it, and unregularised work is a routine cause of delay or a price reduction when you sell.

Where we come in

We confirm which route applies to your property in writing, prepare the drawings, and handle the application with the council. See renovation drawings, or get your drawings quoted with no obligation. If any application we submit is refused, you get a 100% refund within 5 days.